Description
The installation of an 8-bar steam boiler with a 2,500 kg/h steam capacity.
The manufacture and supply of the support structure and the auxiliary maintenance structure, the construction and installation of the gas train, and the conduit connection to the existing steam circuit with all interruption devices and necessary instrumentation.